The technical proposal
Prepare the plan, draft the proposal and track its drafting, then read it; editing it and its versions have their own articles.
Updated on November 7, 2026
The technical proposal is prepared in three steps: the plan, its drafting, then reading and touching it up. Each tender has its own proposal, opened from its tender page or its submission page. The button that leads to it says where it stands: Start the proposal when nothing exists yet, Continue the proposal when the plan is prepared (or after a failed drafting), See progress during the drafting, Open the proposal once drafted.
Make the provisional schedule first: once ready, it is the only source of the proposal's figures (timeframe, dates, phases and their durations, quantities, rates, resources), and both documents stay consistent. While it doesn't exist, a banner suggests it with Open the schedule; nothing prevents writing the proposal without it. If the schedule misses the contractual timeframe, a banner says so before the drafting and again on the drafted proposal ("The schedule does not meet the contractual deadline: fix it before submitting."). If the schedule changes after the drafting, the banner flags it too, even when the timeframe is missed: reread the sections that quote its duration or phases, and rewrite them if needed with Rewrite with AI. All these points show in a single block at the top of the page, each with the button that leads to the screen where to settle it; the block refreshes when you come back to the tab.
The proposal doesn't wait for the brief either. As long as it is not validated, the page recalls it under the header, before drafting: "The brief isn't validated yet: drafting relies on the answers already given.", with Complete the brief, which opens the brief page. Nothing is blocked.
What the proposal reuses
The proposal reuses My company:
- the company's qualifications and certifications you confirmed, still valid on the bid submission date;
- the average headcount of the last closed year and, if you entered it, its management staff;
- the confirmed people, ordered by role (management, works management, site and team supervisors, QHSE, design office, then the others), with their licences valid on the submission date;
- your equipment, telling apart the machines the schedule uses, those rented for the site ("en location") and the other machines of your fleet, available.
As soon as you have confirmed in My company at least one record of a kind (a person, a company qualification, a machine, a reference), the proposal no longer reuses, for that kind, the items found in your knowledge base: your records prevail.
If My company changes after drafting, a banner says so on the drafted proposal, below the schedule's, with what changed: "My company has changed since drafting (equipment and DC4): reread the sections concerned.", with Open My company It follows people and their licences, equipment, references, the company's qualifications, and the tender's DC2 and DC4. Nothing is written again automatically, and a deletion (a removed subcontractor, for instance) doesn't show in it.
Prepare the plan
Prepare the outline asks Vialogic for a plan drawn from the DCE, in about a minute: when the consultation rules describe the expected proposal, the plan reuses its sections; otherwise, Vialogic proposes a standard plan. Nothing starts just by opening the page. If the preparation fails, Try again relaunches it. Without the Technical or Management role, you read "The outline is not prepared yet: a member with the Technical or Management role starts it from this page."
Review and validate the plan
Each section carries a title (required), drafting guidance, an optional form constraint and, when the RC's scoring grid allows it, the criterion it addresses. Add, rename, reorder or delete sections and their subsections (three levels at most), then Save if you want to keep your changes without drafting. A title's field wraps to show it in full. A banner flags a scoring criterion that no section addresses. The actions stay visible at the bottom of the screen while you browse the plan. Prepare the plan again re-runs the extraction from the DCE and merges it into the current plan: proposed sections are replaced, but hand-written guidance and subsections, chosen criteria and hand-added sections with content are kept; unsaved changes, the section order, and retouched titles or constraints of matched sections are lost.
If a proposal has already been drafted, Back to the drafted proposal returns to reading it without changing anything.
Draft the proposal
Draft the proposal saves your changes, validates the plan and launches the drafting, in a single step. Drafting follows the plan's order, several sections at a time: the tracking screen shows those in progress, the elapsed time, and reminds you that drafting goes on if you leave the page. A section drafted with low or medium confidence says so, to reread first. If drafting fails, Back to the outline reopens the plan, from which Draft the proposal starts it again. If a proposal already exists, a confirmation warns that a new drafting replaces the version shown.
The length follows the number of pages set by the tender regulations. When they set none, Vialogic sizes the proposal to a customary length: 15 pages for a MAPA (10 for a contract under €90,000 excluding VAT, 20 from €1M excluding VAT), 30 for a formal procedure. The proposal doesn't claim the regulations require it.
When the drafting is refused
A company declared both as a member of the consortium (DC1 and DC2) and as a subcontractor in the DC4 blocks the drafting. A window names it ("… is both a member of the consortium (DC1/DC2) and a subcontractor (DC4): remove it from one of the two before drafting."); Open the submission leads to the DC2 and the DC4, which carry this open point. Fix one of the two, then launch the drafting again.
A schedule that misses the contractual timeframe asks for a confirmation, which gives its end and the timeframe. Fix the schedule, offered first, opens the schedule; Cancel closes the window. Draft anyway launches the drafting: the proposal commits to the contractual timeframe, with no other duration or end date, but the attached schedule still shows its own end. Fix it before submitting.
When either one will apply, a line says so under Draft the proposal and in the confirmation of Draft again.
Read the drafted proposal
Once drafted, the proposal reads section by section. At the top of the page, a line gives the number of sections, the number of pages against the limit set by the consultation rules (in red when exceeded) and the total of points to check. The table of contents, on the left on a large screen (behind the Table of contents button on a smaller one), numbers the sections like the exported PDF (the opening summary has no number), gives for each one the award criterion it addresses with its weight and its estimated length ("≈ 2.5 p.", its share of the PDF's pages), and follows your reading: the current section is highlighted. Each section is a card, its title above those of the text, with its Edit and Rewrite with AI buttons always visible. A section carries a badge when Vialogic finds in its text a point to check before submission: a document said to be attached or handed in with the offer while no attached appendix carries it, text « à compléter » left to complete, a person described without their name, a completion time that matches none of those the tender documents set ("délai global de 10 semaines" for phases of 2.5 and 3.5 months), a variant element mentioned outside its own part ("contrôle du gabarit avant fabrication des coques" among the base solution's checks). The schedule is not one of them when the bid has a ready schedule: it always goes with the bid. The sentence at stake is quoted under the section title, and the submission page keeps the proposal to do while any remain, as well as while it exceeds the number of pages the consultation rules allow. In the exported PDF and Word files, a table of contents of more than 30 entries keeps only first-rank subheadings ("1.1"). The proposal's actions stay at the top of the screen while you scroll. Prepare the submission leads to the submission page, where the proposal is exported to Word and PDF with the rest of the bid. PDF preview opens the render as it would be submitted. Appendices opens the proposal appendices: the documents the rules require you to attach, and the places where the proposal refers to them. The … menu holds the rest: Review the plan reopens the plan without erasing the proposal, History opens the whole proposal's versions, and Draft again, set apart from the other two, launches a full new drafting, which replaces the version shown and your edits (the previous version stays in the History).
The photos from your photo library
At the end of drafting, Vialogic places in the proposal the photos from your photo library that are ready (a description and an origin), each just after the sentence that justifies it. A banner says so during the few minutes it takes; you can read and edit the proposal in the meantime.
Once the photos are placed, the banner says how many and in how many sections, and the outline shows "N photos" under each section concerned. In the margin, next to each photo, a Placed here, because note quotes the sentence and gives the reason, with Remove and See the record. Doing nothing keeps the photo.
Review them shows them one at a time: the proposal page, the sentence and the photo highlighted, and on the right the reason, the attachment, the origin and the caption, which you can correct. Enter keeps, Backspace removes the photo from the proposal, ← goes back, Esc quits. The cover page photo comes first and is removed separately. A removed photo stays in your photo library, and is no longer placed in this proposal.
The banner also says when nothing was placed: no photo fits this proposal (Restart tries again after you have added or filed photos), no photo is ready (File my photos), or placing was interrupted (Restart; the proposal has not changed). For a proposal drafted before your photos, Place my photos starts placing them. Replacing the image of a placed photo with a file from your computer detaches it from the photo library.
Without the Technical or Management role, or with a paused or free-plan subscription, you see everything without changing anything.
To touch up the text, see Edit the technical proposal; to find a version, The versions of the technical proposal.
Related articles
- Your photo libraryUpload your worksite photos, one by one or as a ZIP, sort them one at a time, and see your fleet, worksites and teams in pictures.
- Edit the technical proposalTouch up a section of the drafted proposal, rewrite it with AI, and work together on the same proposal.
- The versions of the technical proposalFind, compare and restore the versions of a section or of the whole proposal, and what a member who can't edit the proposal sees of them.