Fill in the DC2

The candidate declaration in its panel: the points to decide first, then its folded sections, what it takes from My company.

Updated on November 7, 2026

On a tender's submission page, Complete DC2 (or View from Ready) opens the DC2 in a side panel. Its title says how many points are left to decide: "3 points to decide. The rest comes from My company."

First the points to decide

The panel starts with the decisions the saved DC2 has not made yet, those with no default answer: non-exclusion (DC1 F1), proof of capacities (DC1 F3), SME (DC2 C1), and in a several-liability consortium the jointly liable lead member (DC1 D). Each one reads "To decide · 1 of 3". Once saved, a decision moves to the folded rows.

Then come the other open points, what is left to handle, as a reminder, never as a block, then reminders stating what no entry clears, for example, in a consortium, to obtain each co-contractor's commitment and DC2: they don't change the status.

The sections of the form

Under Already filled in, the rest folds into rows, each with a summary ("The applicant alone", "Ten-year insurance ticked · no reference chosen"): Applicant, Declarations and evidence, Taken from My company, Reserved contract, participation conditions, Capacities and project references, Operators whose capacities you rely on. They hold this tender's choices for the DC1, then those of the DC2. The letter of each section in the official form (DC1 from 2019, DC2 from 2023) shows when hovering its title: the same letters name different sections of the DC1 and the DC2.

Application letter (DC1):

  • C Purpose of the application, for a contract divided into lots: the For all lots box. A tender targets a single lot; when ticked, the DC1 presents the application for all lots of the tender, otherwise for this tender's lot;
  • Applicant: None: the candidate applies alone, Consortium with several liability (conjoint) or Consortium with joint and several liability (solidaire) (see consortium). In a consortium, the Lead member of the consortium, chosen from the list of members (you, then each named co-contractor) so that its full identity is printed, and the other members (company name, SIRET or registration number outside France, address, email, phone, lot). In a several-liability consortium, you also say whether the lead member is jointly and severally liable, and each member's work, yours included;
  • F1 Exclusion grounds: the box of the sworn statement;
  • F3 Proof of capacities: with the DC2 form, or with the documents requested in the tender;
  • Supporting documents available online: an optional address, used in every section that provides for it.

Applicant's declaration (DC2):

  • C1: is the applicant an SME. The European definition also counts linked companies: if your company belongs to a group, count their headcount and figures;
  • C2: reserved contract, or Not applicable;
  • C3: official list of approved operators, and the overall statement on participation conditions, to tick only if the buyer allows it;
  • E2: specific authorisation, for a service contract;
  • F1: the share of turnover related to the contract, in %, for each of the last three closed financial years in My company, the ones the DC2 prints. Each share is attached to its year by its end date: adding or removing a year in My company never moves it. A share whose year has left My company stays saved but is no longer printed, and the section says so ("The financial year ending on … is no longer in My company: its share is no longer printed."). A DC2 saved before this rule shows "Shares taken from an older save: check them, then save.";
  • F2: other financial information (insurance, accounts);
  • F3: the ten-year liability insurance box, for a works contract;
  • G1: the technical information requested, the equipment, and the project references to print, with their client, year, location and amount. None is selected by default: tick them, in the order you want. The closest to this contract (subject, lot, works) come first, flagged Close to this contract; a reference older than the DC2 period (five years for works, three for services or supplies when the original notice says so) shows "Over 5 years old: beyond the usual period" and can still be ticked. These are your reference records from My company, each with its source file: confirmed ones, and those read in your documents, marked To confirm, which ticking confirms. A proposal to check (role to specify, share to check, likely duplicate) can't be ticked and links to My company. With no record at all, Take them from your documents proposes them here. A confirmed reference that its certificate contradicts shows "Differs from the certificate of completion: check it in My company" ("Share to check in My company" for an unusual share): the DC2 prints the record's value until you correct it. Headcount and qualifications come from My company (see below);
  • H: the operators whose capacities you rely on (company name, SIRET, address, contact, lot, member concerned, capacities provided).

The DC2 has no field for its section B: it prints the subject of the contract, the procedure, the tender's lot ("All lots" when the box is ticked) and the tender reference given by the buyer, entered on the tender page. The DC1 prints it in section B as well. Your internal reference no longer appears on any document.

What comes from My company

Some answers belong to the company, not to the tender: they are entered once in My company › Identity (see Fill in your company profile). The Taken from My company row shows, read only, what the DC2 will print from it, with the export's own wording: the legal form and the SME answer (C1), the professional register (E1), the three financial years and their turnover (F1, with the creation date when there are fewer than three), the average headcount and the qualifications (G1), the codes of a single qualification grouped together. Closed financial years, headcount and validity are assessed as of the reference date the box shows: today, or the tender deadline if it has passed. What My company lacks reads "Not provided"; Edit in My company leads there.

  • SME (C1), ten-year liability insurance (F3) and supporting documents available online: a DC2 that was never saved takes them as long as they are empty here. You can change them for this tender. Once the DC2 is saved, it keeps its answers: if My company says otherwise, the section shows it ("My company says: Yes.") and Use it puts back the company's answer. From two differing answers, Use everything from My company, below the points to decide, puts them all back; the DC2 only changes with Save.
  • Equipment (G1): tick, in your confirmed equipment, what this DC2 prints. Until you change anything, the boxes ticked by default are the machines the tender's schedule uses ("Ticked by default: the machines the schedule uses."), otherwise your whole fleet. The tender's Tools, equipment and technical resources field completes it, for equipment specific to that site.
  • Headcount and qualifications (G1) are printed straight from My company: the headcount of the last three closed years filled in (never the current year), and your confirmed qualifications that are still valid, with their end date. A certification that is only suggested, expired or held by an employee isn't included.
  • Financial years (F1): only closed years are printed, the last three, from the oldest to the most recent. After the bid deadline, a new export restates what was true at submission.

Reuse your partners

Your partners, entered in My company, are reused here instead of being retyped. Under the list of members as under the list of operators (H), Choose a partner adds a row filled with its identity; the lot, the work and the capacities provided remain to be specified for this tender. The row then carries the Partner record badge.

The identity is copied into the DC2: changing the record afterwards doesn't change this tender by itself. The row says what differs from the record ("Differs from the partner record: phone."), whether the record or the row changed and Use the record again copies the up-to-date version; an empty field on the record doesn't erase what the row holds. If the records could not be read, the row says so instead of hiding the differences. Unlink the record removes the link: the row keeps what it holds. Conversely, a row typed by hand can become a record with Save as a partner; if an active record already has its SIRET, the row is linked to it, and if it is archived, the message says where to find it.

Save the DC2

Add a member and Add an operator add a line, Remove takes it away; a line left empty is not saved. No field is required: Save, at the bottom of the panel, sends the whole form, and the open points update, on the page as in the panel. A DC2 never saved stays Prefilled, even without open points. Closing the panel or leaving the page with unsaved changes asks for confirmation.

Without write access (without the Administrative or Management role, free plan, paused subscription or submitted bid), the DC2 can be read but not changed, and the reason is shown.

Related articles