Proposal appendices

The documents the rules require you to attach to your bid: attach them, cite them in the proposal, and see where the proposal refers to them.

Updated on November 7, 2026

The consultation rules often require documents that are not written in the proposal itself: a method statement, a quality plan, a safety note… In the technical proposal, the Appendices button (with a paperclip) opens the panel that gathers them. It shows how many are already attached (for example "1/2"): the counter matches what the export will include, that is the documents due at submission and any document already attached, a part of the proposal included. It does not count the proposal itself, nor the schedule, a successful bidder's document or a still-undecided mention of the tender documents until a file is attached to it. Vialogic attaches your documents as they are: it never changes them. On the submission page, the Bid documents line counts what is left to attach, these documents included, and leads to their screen, where they can be attached too (see Bid documents).

What the rules require

The panel lists the documents found in the rules, each with its exact wording, never rephrased: the buyer checks that your bid is complete against that wording. A long wording is collapsed; Read the full wording shows it in full.

Each document shows two markers: its form on export (Appendix 1, Appendix until a file is attached, or Separate file) and its status (Missing, Provided or Expired).

The rules sometimes list the proposal itself among the documents ("Technical proposal"), or the parts it must contain. Those are not attached: the proposal shows Written here, a part In the proposal, with no file and no export form, and the proposal cannot refer to them. A part to which a file had been attached becomes an ordinary document again. The same goes for the schedule the rules require ("Provisional works schedule"): Vialogic produces it in the Schedule screen and submits it separately. Its card shows Produced here, with no file and no export form, and Open the schedule leads to its screen.

The reading of the rules can be wrong. You correct the list by hand:

  • Add a document the rules require, with its exact wording: it becomes a proposal appendix. A wording already in the list is refused;
  • Rename or Remove from the list, from the document's More actions menu. A removed document does not come back on a new reading of the rules; to restore it, add it by hand;
  • Move up and Move down change the order of the documents, which is also the order of the appendices.

Attach a file

  • Attach from Documents searches Documents by file name, folder or content ("method statement drilling", for example);
  • Upload a file attaches a file specific to this tender (schedule, site layout plan…), without adding it to Documents. Accepted formats: PDF, Word, Excel, PowerPoint, OpenDocument, PNG and JPEG, up to 100 MB. While it uploads, the panel stays open: Cancel upload stops it;
  • Preview opens the attached file as a PDF; Detach removes it, after confirmation. A file uploaded directly is then deleted; a file from Documents stays there.

If a file had been attached to the document that is the proposal itself, it is not exported: the card says so and only offers Preview and Detach. A file attached to the schedule document, however, is exported, next to the schedule produced here: the card says so too, with Preview and Detach, and the counter counts it.

When a section can refer to an appendix

When a drafted section mostly reuses one of your documents made to be attached (a method statement, a procedure, a technical sheet, a quality plan, a certificate), Vialogic prepares a short version in advance: the passage concerned becomes a brief presentation that refers to the appendix for the details. Never for a CV, a list of references or a staff list: those are cited in the text.

With the Technical or Management role, you see the proposal in a "Can become an appendix" card, in the margin, next to the passage concerned, which is highlighted by a line on its left. When there is not enough room beside the text (phone, tablet, laptop screen), the card sits at the top of the section and names the passage. A dot in the table of contents flags each section where a decision is waiting. While the short version is being prepared, the card shows "Preparing the short version…"; after a few minutes, it says so and offers Refresh, which reads its state again. If the short version could not be prepared, Retry starts again. While you are editing the section, the card offers neither Preview nor Replace; if the text changed, the short version is prepared again from your text once you finish editing.

  • Preview switches the section text to the short version, in place: Current and With the appendix switch between the two, and the card shows the number of characters before and after. Close preview goes back to the text;
  • Replace creates the appendix from the document, attaches and numbers it, then replaces the passage with the short version, which refers to it. The card then shows the number of the attached appendix, or "Appendix removed" if it is later removed from this panel;
  • Undo, as long as the section has not changed since, restores the previous wording and removes the appendix created. After that, restore a version from the section versions;
  • Keep my wording leaves the section as it is, for the whole team: the card disappears, and the message that confirms it offers Undo.

Nothing is attached or rewritten before Replace. Sections kept as prose are listed in this panel, under "Documents kept as prose": the document, a link to the section, and Propose again, which puts the card back in the margin.

When you write the whole memo again, the annexes added by a Replace are undone for the whole bid: a document created by the acceptance and left untouched is removed, a document the team has changed since (renamed, filled in, switched to another file or format) is kept, and a document the tender rules already required goes back to its previous form. The proposal card does not come back for the old version; the new draft prepares fresh ones where they fit. Rewriting a single section leaves the annexes as they are.

Cite an appendix in the proposal

In the text, a reference to an appendix shows as a tag: "appendix 2". To add one, edit a section, place the cursor, then pick Reference an appendix (the paperclip) in the toolbar and the document you want. The reference points to the document, not to its number: if you reorder the appendices, it follows. It is deleted like a word.

A tag also says what is missing: "appendix to attach" while the document has no file, "attached document" for a separate file, "removed appendix" when the document no longer exists, "reference to the proposal" when it points to the proposal itself or one of its parts, and "reference to the schedule" when it points to the schedule, submitted separately with no appendix number: nothing is attached to it, remove it from the text. Reference an appendix does not offer the proposal, its parts or the schedule.

See where the proposal refers to it

Under each document, In the proposal lists every reference: the section, and the sentence around it. See closes the panel and takes you to the reference in the text, highlighted. "Not cited in the proposal yet" flags a document the text never announces. The proposal and its parts have no such block: a reference already pointing to them is listed under "References to remove". References to a removed document are grouped at the end of the panel: on export, they come out as plain text, so delete or replace them.

When the margin is shown, a label there also recalls each attached appendix ("Appendix 2" and its wording), next to its first reference in the section: a click opens the panel.

Before drafting, the panel also opens from the plan: there is then no reference to show.

The form on export

Each document's On export section offers two forms, depending on what the rules ask:

  • Proposal appendix: the file is bound after the technical proposal in PDF, with its number. A Word, Excel or PowerPoint file is converted to PDF for binding;
  • Separate file: the file goes as is into the tender archive.

An appendix can be preceded by a divider page that ties it to this project: subject (the document name if left empty), version, document date, structures concerned and a note. You fill in everything yourself, nothing is inferred, and a field left empty does not appear.

Without write access (without the Technical or Management role, free plan or paused subscription), the panel can be read but not changed, and the reason is shown.

Related articles