Take stock before submitting
On the submission page: what is left to do, what is ready, the detail panels, the required documents, the submission questions, the schedule, the proposal, the bid documents and the validated brief.
Updated on November 7, 2026
A tender's submission page tracks ten elements: the documents required by the regulations, the submission questions, DC2, the provisional schedule, the technical proposal, the financial offer, the bid documents, DC1, DC4 and the brief. Each one is either to do or ready. Nothing is blocking: the page guides you.
To do before submitting
This list only shows the open points, numbered in the order to handle them. Each one says in one sentence what is missing and has a single button, which opens its details:
- Documents required by the regulations: "0 of 3 provided.", or "The regulations have not been read yet.", or "The regulations could not be read: read them again."; Attach the documents;
- Submission questions: the bid submission rules still to settle ("Submission questions: 3 to settle"); Settle opens their screen (see Submission questions);
- DC2: the decisions to make, named ("DC2: 3 points to decide"), otherwise its other open points or a DC2 to save; Complete DC2. A saved DC2 that differs from My company is ready: the line flags it ("saved · different from My company on 2 answers"), since a bid-specific value may be intended;
- Provisional schedule: "Not generated yet", "Generation in progress" or the message of a generation that failed, with Generate the schedule (Open the schedule for whoever cannot change it, and during the generation); a ready schedule stays to do if it misses the deadline set by the tender documents ("Schedule: completion deadline not met") or still has estimated durations to confirm ("Schedule: 2 durations to confirm"), with Open the schedule (see The provisional schedule). When the tender rules ask for it, the line adds in small print "Requested by the tender rules", with the sentence of the rules that says so. When the tender rules, read in full, do not ask for one, a schedule not ready yet is no longer to do: it moves to Ready (see below). As long as the rules have not been read, or mention a schedule without it being clear, the schedule stays to do;
- Technical proposal not drafted yet: its state and its button say where it stands, "Not started yet" with Start the proposal, "Plan to validate, proposal to draft" or "Plan ready, proposal to draft" with Continue the proposal, "Drafting in progress" with See progress, "The last drafting failed" with Continue the proposal (see The technical proposal). A drafted proposal stays to do while figures remain to illustrate ("Drafted: 7 figures still to illustrate."), while its text has points to check ("Drafted: 2 points to check in the text.") and while it has more pages than the consultation rules allow ("Drafted: 27 pages, for 20 at most under the consultation rules."): pages are counted on the proposal as it is exported, cover, summary and table of contents included, since a bid outside the format is rejected before it is scored;
- Financial offer: "Price templates not read yet." with Read the templates, then what remains, one thing at a time: reading the templates again if the DCE has changed, the prices to enter ("12 prices to enter", not counting those of a variant nobody prices), the filled templates that have a blocking check, then the templates to generate, with Open the financial offer (see The financial offer). Once ready, it still names the wrong formulas of the buyer's file (a line amount that doesn't read its price, a total that counts its subtotals): Vialogic never touches them, report them to the buyer before submitting. When the DCE contains no price template, or the templates read have no cell to fill, it moves to Ready, without a tick, "optional";
- Bid documents: what the DCE asks you to submit with the offer, found across the whole DCE. The item counts those to provide ("3 bid documents to provide"), says "5 of 8 attached.", the expired documents, the attached documents since removed from Documents (they would still go into the export: check them) and the DCE mentions still to decide, which never block; Attach the documents opens their screen (see Bid documents). The proposal itself and the parts of the proposal the regulations list do not count, neither provided nor missing: the proposal written here covers them, and has its own item. Even with all of them attached, it stays to do while the list is not settled: during the DCE analysis, after a failed analysis (the list of an earlier analysis stays on screen, but the DCE may have changed since), and while the list only comes from the consultation rules; on a DCE never analysed, Analyse the whole DCE leads to the button that starts the analysis. A settled list that asks for no document, or whose documents are all attached, moves to Ready;
- DC1 incomplete: My company is missing some information; See DC1;
- DC4 with forms that have open points, or a subcontractor that is also a consortium member; Complete DC4;
- Brief: see below.
If an element could not be read, its point says so, with Try again, never hiding the others. An element never analysed (submission questions without a brief, a brief not prepared yet) stays to do, never ticked as ready.
Once the tender is submitted, the list is titled Status at submission: it keeps the points left open, with no number or main button, and the Submit to the buyer step disappears.
Ready and the progress
Ready lists each ready element on one line, with a tick and a summary: "Provisional schedule · works end on …", "DC4: subcontracting · no subcontractor declared", "Submission questions · 12 of 12 settled", "Response brief · validated on …". View opens its panel (or the submission questions screen), Open the schedule and Open the proposal their page; on the bid documents, View opens their screen. A schedule the tender rules do not ask for appears there without a tick, with a dotted circle: "Provisional schedule · optional: the tender rules do not ask for a schedule", and Generate anyway if you want to attach one to your offer. The header counts both lists: "5 of 10 ready", "4 to do"; an optional schedule counts among the ready ones, never among the elements to do.
The detail panels
The details open in a side panel (from the bottom on mobile), never expanded in the page: the documents and DC1 (see Administrative documents and DC1), DC2 (see Fill in the DC2), DC4 (see Declare your subcontractors) and the brief. What you do there updates the page straight away: an element dealt with moves to Ready. Closing a panel whose DC2 is not saved asks for confirmation.
The documents are only those the tender regulations require: no list of customary documents is suggested by default. Until the regulations have been read, or if reading them failed, the point stays to do; if they require no document, the element is ready. The documents asked only from the selected bidder are just information in the panel, never a point to do.
The brief at submission
You answer the brief only once, on its page: once validated, it is Ready ("validated on …, every question settled") and its panel no longer lists its questions. The bid submission rules (checks, commitments, prices) are no longer part of it: they have their own screen, Submission questions, and can still change until submission. Only the brief questions added since remain to do: the rate rows or phase durations the schedule added, and the questions of a corrigendum ("Brief: 2 questions added after validation"). Answer opens the question in a second panel. If the DCE changes after validation, Add the new questions from the DCE rereads it without touching the answers.
As long as the brief is not validated, it has the point Validate the brief. Its panel lists its questions still open; Validate the brief stays inactive while one is open, then opens the same confirmation as the brief page. If part of the tender rules was not read, the point becomes Incomplete brief: "Part of the tender rules was not read: the brief cannot be validated as is.". See the brief opens its panel, where a member with the Technical or Management role completes it with Read the tender rules again. A brief not prepared yet has the point Brief to prepare, with the same button.
Related articles
- The submission of a tenderThe page dedicated to submitting your bid: its header and progress, what is left to do, what is ready, and the Submit column.
- Submission questionsThe bid submission rules read in the tender rules: checks, commitments and prices, to settle until submission.
- Administrative documents and DC1On the submission page: only the documents the regulations require, the state of their reading, attaching them from Documents, and DC1 read from My company.