Write a document in Vialogic
PPSPS template, SOPAQ, SOPRE, note: write in Vialogic a document the DCE asks for and you don't have, complete it, then attach it to the bid.
Updated on November 15, 2026
The DCE sometimes asks for documents your company does not have yet: a PPSPS template (site health and safety plan), a SOPAQ (quality assurance plan outline), a SOPRE or SOGED (environmental plan, waste management), a note on a site risk. Vialogic writes them for this tender, from what it already knows, without making anything up.
Which documents
In the bid documents, the details of a document to attach offer Write in Vialogic when its label names a PPSPS or a prevention plan, a quality plan (SOPAQ, PAQ), an environmental plan (SOPRE, PRE, SOGED, SOSED, environmental report) or a note (note, instructions, procedure, method statement). Never a calculation note, an asbestos removal plan, a certificate, an attestation, a data sheet or a drawing: those are attached. A document that already has a file attached offers nothing.
Where the text comes from
Vialogic reads the DCE passages that ask for the document and lists its content requirements, each quoted word for word. It then writes the document section by section, on a standard outline (for a PPSPS: general information, organisation, hygiene, first aid, risk analysis, equipment and protection, training), from these sources only: the DCE's requirements, your documents (method statements, procedures, CVs…), your resources (people, authorisations, equipment, qualifications), your ready schedule and your brief's answers. A name, a figure, a duration, a certification, a piece of equipment or the assignment of a person to the site that no source gives is never written: in its place, a [À compléter : …] mark ("to complete") says what is missing. A commitment (a facility, a check, a method) neither the DCE nor your documents state may be written, but it is highlighted "to review": keep it, edit it or remove it. What your documents, your schedule or the DCE already state (company name, SIRET, contracting authority, schedule phases, time limits) is not highlighted. A person of your company is presented as available; their assignment to the site carries a single mark, in their name: [À compléter : confirmer l'affectation de … au chantier] ("confirm the assignment of … to the site"). Writing takes one to two minutes; the document's details follow its progress.
Review and complete
Review and complete opens the document. At the top, what is left to do: each item to complete, with its section and the sentence that carries it; an item written in several places appears once, with the number of times it occurs. A click opens the section. Then the DCE's requirements, each with its passage and the section that covers it. Then the text: Edit opens a section in the same editor as the technical proposal, saved as you type. Replace each mark with the information, or remove it if it does not apply. Write again, after confirmation, replaces the text and your edits with a new draft.
Attach the document to the bid
Once no item is left to complete, Approve and attach to the bid makes the text the document's file: a PDF in your documents' design, attached like an uploaded file. The document then counts among those provided and goes with the tender export. While an item remains, the button attaches nothing: a document with gaps is never submitted. Commitments highlighted "to review" do not block it: the document's box gives their number, and their mark does not appear in the attached file. If you edit the text after attaching it, the document reads To approve again: the attached file stays the approved text until the next approval, and the Bid documents line of the submission page flags it without saying Ready. A submitted tender is read-only: the document can no longer be edited, written again or approved.
Related articles
- Bid documentsThe "Bid documents" screen, opened from the submission page: what the DCE asks you to submit, where it asks for it, and the documents to attach.
- Edit the technical proposalTouch up a section of the drafted proposal, rewrite it with AI, and work together on the same proposal.
- Take stock before submittingOn the submission page: what is left to do, what is ready, the detail panels, the required documents, the submission questions, the schedule, the proposal, the bid documents and the validated brief.
