Your project references
Your completed projects as confirmed records: year and amounts as numbers, your role and share, the certificate. The DC2, the technical proposal and the tender watch use them.
Updated on November 7, 2026
The References tab of My company gathers your completed projects, one record per project: the Title, the Client, the Place, the completion Year, the Contract amount excl. VAT, Your role, Your share excl. VAT, the Techniques, a Description and the Certificate of satisfactory completion, chosen among your documents.
Why confirm your references
Vialogic already reads references in the documents you upload: work certificates, reference lists, past technical proposals. But it also reads them in CVs, where a project may be one an employee did for a former employer, and it can't always tell whether an amount is the contract's or your share.
As long as you haven't confirmed any reference, the DC2 offers the references read in your documents as records marked To confirm (see below): never the raw lines of a certificate, such as "Montant total du marché" or "Montant des travaux sous-traités". The technical proposal only cites those with nothing to check. From the first confirmed reference, the technical proposal and your tender watch only use confirmed references. As long as none is, the screen says so under its title.
Role and share
If you didn't carry out the whole contract, in a consortium, as a subcontractor or for one lot, choose Your role (Lead member, Co-contractor or Subcontractor; Contract holder if you carried it out alone) and enter Your share excl. VAT. The DC2 and the technical proposal then show your share next to the contract amount, never the total alone.
Differences with your certificates
Use those in your documents also rereads each confirmed reference against its certificate of satisfactory completion, without ever changing it. If the certificate says something else about the contract amount, your share or your role, the record's line says so, for example "Your certificate of completion says: company's share €193,625 excl. VAT (the record says €18,200, which is the amount you subcontracted)." The message after taking them up gives the number of references concerned, and the Differences with your certificates filter, at the top of the list, gathers them. Two actions:
- Keep the record keeps it as is: the difference disappears, and the same reading won't be flagged again.
- Correct opens the edit window, prefilled with the certificate's values when they are certain (an amount, a written role). Check them, then click Save: the difference for the changed field disappears.
Until you decide, the DC2 and the technical proposal use the record's value. A line may also show, even without a difference, "Share below 10% of the contract: to check": for a contract holder or a lead member, such a small share is often a reading error.
Suggested references
At the end of each document import, Vialogic suggests on its own the references it read there; Use those in your documents does it again on demand and turns the references already read in your documents into records. The fields of one certificate are put together, and one contract read in several documents (your reference list in Word and in PDF, its certificate) makes a single record, which keeps every file. The year comes from the end date of the works on a certificate, or from the year under which your list files the project. Field names of a certificate and price schedule lines are not suggested. A document whose name says "attestation" becomes the record's certificate. Nothing is made up: a field the document doesn't state stays empty.
These records appear under To confirm, each with the file where it was read; clicking the file name opens it in Documents. Beyond five suggestions, To confirm collapses to keep your references on screen: click its title to expand it. Under "Read in", the quoted passage is the document's actual line: the table row of your list, the certificate's amounts as written, or the sentence that carries the amount. Without a reliable passage, only the file is cited. Check above all the role and share, which Vialogic deduces from the text, and whether the client is public or private, which it only guesses when the name says so: a municipality, an urban community, a syndicate (SYDEC, SIVOM…), a public water utility are public; an SAS, a motorway concession company, a construction company are private; SNCF, Enedis or a semi-public company stay not specified. Confirm adds it to your tenders, Edit corrects it first, Dismiss archives it: dismiss a project from a CV that isn't yours. A reference already taken is never suggested twice: the same project read elsewhere (your share written in your table, a rounded amount, the client's acronym) completes the existing record instead of making another one.
Sort and confirm in bulk
The most complete suggestions come first: client, year, amount and certificate. Each one says Complete or what it lacks, for example "To complete: year, amount". "role" is added when no document proves your role: Vialogic suggests the most likely one and says so, for example "Subcontractor (role to be confirmed)" for a project done for a construction company, or "Co-contractor (role to be confirmed)" when your share leaves the rest of the contract to others. Edit makes you choose the role; confirmed as is, the reference keeps the suggested role. The With certificate only and Incomplete filters narrow the list, shown in pages of twenty (Previous, Next). Tick suggestions, or Select this page, then click Confirm selection or Dismiss selection: only the filter's suggestions are processed, and those that don't go through stay to confirm.
Signals and safe suggestions
A suggestion that needs a look carries a badge:
- "Role to specify": no document proves your role;
- "Share to check": your share is the amount you subcontracted, or is under 10% of a main contractor's contract;
- "Probable duplicate of an existing record": the same project seems to be in your references already, or archived (same client and same amount, or places in common); dismiss it if it is indeed the same.
A suggestion with no badge is safe. Select the N safe ones ticks all those of the filter, on every page: then click Confirm selection.
Add a reference by hand
- Click Add a reference.
- Enter the Title and choose Your role (both required), then what you know about the project. Under the Client, choose Public, Private or Not specified: the DC2 asks, for each reference, whether its recipient is public or private. An amount is written in euros, for example 211,825 or 1,234.50.
- If needed, choose the Certificate of satisfactory completion among your documents: type a few letters of its name to find it; likely certificates come first.
- Click Save.
Closing the window (Cancel, the cross or Escape) after typing asks for confirmation before losing your input.
In the DC2
The list of references to tick in section G1 of the DC2 shows your confirmed references and, next to them, the proposals marked To confirm. Ticking a proposal confirms it here, in My company; a proposal with a point to check (role to specify, share to check, likely duplicate) can't be ticked: the DC2 says so and links here. The DC2 only prints confirmed records, with the client and its status when it is specified, for example "Bordeaux Métropole (public)". A reference you had already ticked in a DC2 and have confirmed since is replaced there by its confirmed record. A reference ticked before records existed that didn't get one is no longer printed: the DC2 flags it, with Remove them. A reference that differs from its certificate shows "Differs from the certificate of completion: check it in My company" there, and an unusual share "Share to check in My company".
Archive removes a reference from your next tenders without deleting it; Show archived shows it, and Reactivate brings it back. A dismissed suggestion that was never confirmed goes back to To confirm instead. The Technical and Management roles edit references; other members can view them.
Related articles
- Your equipmentYour machines and equipment, entered once in My company or suggested from your documents, used by the DC2, production rates, the schedule and the technical proposal.
- Fill in the DC2The candidate declaration in its panel: the points to decide first, then its folded sections, what it takes from My company.